TIMIRON timiron.ai
Concrete mixer truck and pump truck at a jobsite
Wikimedia / CC BY-SA
construction calculator

Concrete Cost Estimator

Estimate ready-mix concrete cost from the volume in cubic yards and your delivered price per yard, with an optional waste allowance.

How it works

adjustedYards = cubicYards x (1 + waste% / 100). cost = adjustedYards x pricePerYard.

Worked example

10 yd3 at $150/yd with no waste: cost = 10 x 150 = $1,500.

When to use it

  • Delivered price often includes a short-load fee under 3-4 yd3 and possible fuel or overtime surcharges — confirm with your supplier.
  • Pair with the concrete, footing, or column volume calculators to get the yardage first.

Related calculators